CORROSION RECTIFICATION

PROJECT DURATION  | Initial engagement – 5 months. Ongoing for a continuous 14-month duration with a forward project scope extending 18 months.

SCOPE / SERVICES PROVIDED

Conduct blast and painting activities across various structures on the site over a period of four months, working at heights to eliminate the need for scaffolding.

PROJECT EXECUTION

With a multidisciplinary team on site, we ensured a comprehensive execution of all aspects of the scope and expanded our services with mechanical trades as a turnkey provider.

  • 14 months later we and still on sites undertaking all scope of works including
  • Mechanical
  • Blast and Paint
  • NDT
  • Shutdown Support

CHALLENGES AND SOLUTIONS

The project presented multiple challenges, primarily due to the operational nature of the plant. Our approach involved meticulous planning and scheduling to align with non-operational periods and scheduled shutdowns, ensuring minimal disruption to plant operations.

One notable task was the restoration of the heavily corroded CV002 take-up tower. Our team innovated by using custom-sized tarps to create a safe work environment that allowed for:

  • Blasting and painting
  • Over plating critical sections
  • Fabricating and installing structural support and three staircases

These measures ensured that there was no downtime for the plant, highlighting our capability to deliver complex projects seamlessly.

OUTCOMES

Through strategic innovations and operational adjustments, we have delivered notable cost reductions, enhancing the overall value of the services provided to our client.